Training Schedule PDF Print E-mail

 

 
Fort Ross 2009 Training Plan
Training Second Monday of the month.
Third Saturday of the month.
Fourth Wed of the month.
























January 12 Structure Fires

                        Initial Attack Size up

                        Reading Smoke Fire Behavior

                        Fire Ground Safety Back up teams

                        PAR

                        Developing Objectives, Tactics, and Strategy

 

February 9 Medical Aid - Pediatric (Hands On)

                        Victim assessment Airway management

                        Vitals Packaging and transport

 

March 9 Energized Power Lines and Fire ground Hazards

                        Recognizing hazards Thorough hazard assessment

                        Understanding power and distribution Calling for PG&E

                        Other hazards per Op area SOP

 

April 13 CPR and AED

                        Patient Assessment CPR

                        Airway management and supplied Oxygen AED

 

April 18 Wildland prep

                        Hose testing

                        Pump Operations

                        Equipment checks

 

May 11 Vehicle Extrication (Hands on)

                        Vehicle anatomy (air bags, electrical hazards, etc)

                        Safe Operation of available extrication tools

                        Safety precautions for vehicle fires

                        Roadside Safety Removing a victim safely

 

May 16 Saturday 6- hour class on Vehicle Extrication

                        Hands on extrication techniques

 

June 8 Wildland Review

                        LCES (lookouts, communications, escape routes, and safety zones

                        Fire shelter (deploying standing and lying down)

                        10 Standard Fire Orders

                        18 Watch out situations PPE Checks

                        Communications ICS

                        Accountability

 

 

July 13 Structure Fires (In the Field – pick a house and preplan)

                        Structure Protection Structure Triage

                        Personnel Accountability (County wide PAR SOP)

                        PPE SCBA

                        Communications Accountability ICS

                        Safe Operations

 

August 10 Wildland

                        Equipment Checks and Inspections PPE

                        Mobile Attack Hose lays

 

September 14 Structure Fires (Hands On)

                        Pump operations Hoses and nozzles

                        Hose couplings Fire service wyes

                        Hose clamps

                        Advancing a charged and uncharged hose line

                        Selection and use of fire streams Safe Operations

                        Command/ICS PAR

 

October 12 Fit Test and SCBA

                        Fit test Medical Questionnaire

                        SCBA use, donning and doffing

                        Maintenance and inspection Trouble shooting

 

November 9 Hazmat

                        First Responder Actions and Limitations

                        Transportation Size up IDHA (placards/ Shipping papers)

                        Scenarios Integration with the Hazmat team

 

December 14 Medical Aid

                        Patient Assessment C-Spine

                        Strokes Altered level of Consciousness

                        Airway management Vitals